ZSoil tutorial · 3D modelling
Practical modelling of deep excavations
Follow the preparation of a three-dimensional deep-excavation model, from ground domains and
seepage conditions to retaining walls, supports and a piled raft.
Course Notes & Input Files
Start with the illustrated guide and download the data used in the modelling exercise.
Practical Modelling of Deep Excavations
Illustrated course notes covering the model geometry, construction stages, groundwater conditions and structural elements. 132 pages.
Input files for the tutorial
Download the model data to follow the exercise in ZSoil.
ZIP
The videos follow the original modelling sequence. They use the interface available when the course was recorded.
1. Initial Settings & External Ground Domain
Import the model settings and prepare the external soil domain, boundary conditions and mesh.
1. Import data and settings
Step 1 of 18 · Duration: 1:29
VIDEO
2. Create the external 2D ground domain
Step 2 of 18 · Duration: 3:16
VIDEO
3. Create the external 3D ground domain
Step 3 of 18 · Duration: 1:09
VIDEO
4. Set external boundary conditions and generate the mesh
Step 4 of 18 · Duration: 2:54
VIDEO
2. Excavation Domain & Seepage
Build the internal soil domain and define the excavation and seepage conditions.
3. Support Elements
Add shotcrete, nails, anchors, struts and slabs to the excavation model.
4. Model Extrusion, Symmetry & Meshing
Extend the geometry, apply symmetry and generate the finite element mesh.
5. Diaphragm Wall, Interfaces & Piled Raft
Complete the model with a diaphragm wall, interfaces, a bottom slab and piles.